Apartment
Private house
Renovation is complete
Renovation is underway
Renovation is planned
What would you like to automate?

For a finished interior, we usually start with wireless options to avoid installing new wiring.

WIRED SYSTEMS · KNX

Build your home. Plan your comfort.

A new build or major renovation is a chance to make everyday life feel easier. We plan a wired KNX system from the start, with straightforward everyday controls for lighting, temperature and curtains.

Discuss my project↗
Wall control panelHOMEIQ / 02

Lighting that is easy to control

Switch on the lights at the door, turn them off by the bed or choose softer lighting for relaxing. Group the lights you need under one button.

Comfort you come home to

Choose a comfortable room temperature from a wall control or your phone. Available controls depend on your heating equipment.

One button. Home is ready.

Turn off selected lights and close the curtains with one button as you leave. Come home to your favourite evening setting.

OUR MAIN FOCUS

A wired smart home starts with a plan.

Designing, installing and configuring wired systems is our main focus. Bring us in before the electrical installation so cabling, the cabinet and controls can be planned together before the finishes.

KNX / 01

What does wired actually mean?

Buttons and sensors send commands through a dedicated cable. Press a button by the door and the system switches off selected lighting groups. Power cables supply equipment; the control cable carries commands. Their routes are planned in advance.

  1. 01Button or sensor
  2. 02Control cable
  3. 03Control module
  4. 04Lights, heat, curtains
BEFORE THE FIRST CABLE

Decisions to make before finishing

01

Convenient buttons and clear zones

We mark lighting groups, switches and temperature zones on the plan. For example, switch on a bedroom light at the door and turn it off beside the bed. We plan those control points in advance.

02

Room for the cabinet and cables

We plan cabinet equipment, service access and spare capacity. Cable routes are coordinated with the electrician and other contractors so automation fits the electrical design.

03

Compatibility before buying equipment

We check lights, drivers, curtain motors, heating and ventilation models. Some equipment needs an additional interface or a different control method to join the system.

04

Preparation for future features

You can prepare curtain cabling, cabinet space and sensor positions without installing everything immediately. Future features will still need compatible equipment and configuration.

HOW IT FEELS EVERY DAY

Fewer steps. More convenience.

Lighting within reach

Turn the lights on at the door and off beside the sofa or bed. One button can control several lights, saving a trip around every switch.

Curtains at a touch

Open or close curtains from a wall button or your phone. Particularly useful for large windows and multiple curtains in one room. This needs suitable motors and power.

Straightforward temperature control

Choose a room temperature on a straightforward control. Where heating supports separate zones, keep the bedroom cooler and the bathroom warmer.

FROM PLAN TO FIRST PRESS

How installation works

  1. 01

    Plan and priorities

    Review the floor plan and choose what you want to control. Define each room’s functions and agree on budget priorities.

  2. 02

    Engineering design

    Coordinate equipment, cables, cabinet layout and control positions with the electrician and project team.

  3. 03

    Installation before finishing

    Arrange planned cable installation, cabinet assembly and line checks. Record concealed cable locations.

  4. 04

    Configuration and checks

    Program buttons and routines once equipment is ready. Check each zone and agreed behaviour during interruptions.

  5. 05

    Handover to you

    Show the whole family how to use the controls and hand over agreed documentation and access. Discuss support and future changes.

Reliability comes from thoughtful design

Without internet

We design basic buttons and local routines to work without an external connection. Remote phone access and cloud services need internet.

Without power

Cabling does not replace power: equipment stops during an outage. Backup power for selected components is a separate design decision. We check behaviour when power returns.

Everyday controls and servicing

A phone should not be the only way to turn on a light. We plan wall buttons, label equipment and agree on handover of diagrams, configuration and access. Engineering changes need a specialist.

What makes up the cost

Floor area is only a starting point. Independent lighting groups, heating zones, curtain motors, dimming methods and control panels matter more. Design, cabling, the cabinet, installation, programming and commissioning all contribute. We separate the essential foundation from options so you can see what can wait.

BEFORE WE BEGIN

A few answers before you begin

When should we get in touch?

Ideally, while planning a new build or major renovation, before finishing work. A wired system needs its cables planned early. If your interior is already finished, we can help you explore wireless instead.

Can we use what is already in my home?

It is often possible to use some existing equipment, though not everything works together. Send us the models or tell us what you would like to keep. We check the options and explain the most suitable approach.

What happens if the internet goes down?

Basic KNX controls can be designed to work without internet. Remote access and some additional services need a connection. During planning, we agree which functions should keep working without it.

What will it cost and when can we start?

The price and timing depend on your home, the comforts you choose and the renovation stage. Tell us what you have in mind and we will prepare a proposal and agree on a schedule. We discuss equipment, work and ongoing support options in advance.

YOUR HOME. SIMPLE CONTROLS.

Tell us what you have in mind.

Discuss my project↗